Commercial
Gas
Solar

Evergreen Brick Works – Toronto, ON

The Evergreen Brick Works is a multi-use facility comprising various structures, including the LEED Platinum certified Centre for Green Cities (CGC). The five-storey CGC's space heating and domestic hot water needs are satisfied by a Vitocrossal 300, CT3 condensing boiler, augmented by two Vitorond 200, VD2 boilers and six Vitosol 200-F flat plate solar thermal collector panels.

Evergreen Brick Works in Toronto, Ontario. Image courtesy of Tom Arban Photography.
Evergreen Brick Works in Toronto, Ontario. Image courtesy of Tom Arban Photography.

Background

Evergreen, a national charity dedicated to deepening  the connection between communities and nature,  has transformed the site of the former Don Valley Brick Works from an obsolete, deteriorating industrial facility into a vibrant environmental and cultural education centre.

The Evergreen Brick Works is a multi-use facility  featuring refurbished heritage structures, parklands and gardens, a year-round farmers’ market, children’s programs and the offices of several environmentally  oriented organizations.

The facility's showpiece, the Centre for Green Cities  (CGC), is a Leadership in Energy and Environmental  Design (LEED) Platinum certified office building  combining elements from one of the site’s original  buildings with a new structure that incorporates  energy-efficient materials, innovative architecture and other green building technologies. The five storey  CGC houses classrooms, offices and meeting  space, and utilizes an automated heating, cooling and  ventilation system to mimimize energy requirements  while providing a comfortable interior environment  throughout the year.

  

The Viessmann solution

In keeping with the project’s environmentally conscious  vision, facility designers selected energy  efficient and eco-friendly hydronic heating solutions  for the CGC's space heating and domestic hot water  (DHW) needs. Primary heating for the CGC and  neighbouring buildings in the complex is provided by  three Viessmann gas-fired boilers: one Vitocrossal  300 condensing boiler and two Vitorond 200 boilers  in a cascade sytem.

  

Installation details

Water for space heating is distributed though a  variety of specialized radiator designs and a modular,  in-floor radiant heating system. An array of six  Vitosol 200-F solar thermal collectors provides supplementary heating for up to 50% of the  building's DHW supply. A heat recovery system recirculates  heat that would otherwise be lost in cold weather.

  

The results

Evergreen Brick Works demonstrates how high-efficiency fossil fuel and renewable energy systems  can be integrated with green building technology to dramatically minimize CO2 emmissions, conserve  energy and reduce heating costs.

Since its inception, the project has won numerous  awards and received international recognition for  its achievements in promoting urban sustainability strategies, responsible energy use and innovative environmental solutions.

  

Project details

Project year2010

Equipment







Vitocrossal 300 CT3-22
2 x Vitorond 200 VD2-440
Low-Loss Header
Vitocontrol-S Cascade Control
Versatronik BACnet Gateway
6 x Vitosol 200-F
Solar-Divicon-HX

Rated output


814 MBH / 238 kW (CT3)
3052 MBH / 894 kW (2 x VD2)

Boiler installation         

Urban Mechanical Contracting Ltd., Toronto, ON

Solar installation

SolSmart Energy Solutions Inc., Toronto, ON

Related References

Trout Lake Community Centre & Ice Rink
Commercial
Gas

Trout Lake Community Centre and Ice Rink – Vancouver, BC

Vancouver's Trout Lake Community Centre is a LEED certified, state-of-the-art multi-use sports and recreational facility. The Centre's gas-fired condensing boiler system consists of a total of seven Vitodens 200 boilers.

Read more
Social Housing Project – Toronto, ON
Apartments
Gas

Social Housing Project – Toronto, ON

Three Vitocrossal 300, CA3 commercial condensing boilers, each rated at 4000 MBH, replaced two outdated and oversized boilers to provide reliable, efficient heat to three high-rise apartment buildings.

Read more
Table Rock Welcome Centre – Niagara Falls, ON
Commercial
Gas

Table Rock Welcome Centre – Niagara Falls, ON

The Table Rock Welcome Centre, situated next to the world's most recognizable waterfall, hosts more that 8 million visitors per year. Viessmann heating technology in the form of three Vitocrossal 300, CT3 gas-fired condensing boilers, rated at 2702 MBH each, provides space heating for the Centre's new viewing gallery, as well as exterior ice and snow melt.

Read more
YMCA - Sturgeon Bay, WI
Commercial
Gas

YMCA - Sturgeon Bay, WI

A commercial boiler and hot water system replacement for the Sturgeon Bay YMCA pool led to increased efficiency and reliability.

Read more
Vitocrossal 300 CA3 gas condensing boiler
Commercial
Gas

The Jordan Hotel - Sunday River, Maine

Viessmann’s largest condensing boiler helps resort reach new levels of fuel efficiency.

Read more
Vitocrossal 300 CA3 gas condensing boilers
District heating
Gas

School District, Portsmouth, RI

Funding High Efficiency Boiler Conversion with Fuel Savings.

Read more
How can we help?
How can we help?