Apartments
Gas

603 Concord - Cambridge, MA

Compact heating system compliments award-winning modular construction.

View of the residential andcommercial complex at 603 Concord Avenue in the sunshine

Cambridge, Massachusetts is no stranger to innovative ideas. But even in a city renowned for its forward thinking, the residential and commercial complex at 603 Concord Avenue stands out. Built in units designed and fabricated by AbodeZ, an integrated development company specializing in modular construction, 603 Concord is the first project in the commonwealth to stack modules five stories high. Its 61 residential units and three ground floor retail spaces make a colorful aesthetic statement as powerful as its design is innovative. Projected to be open in May 2015,  603 Concord has been honored with the 2014 Professional Builder Design Award in the category of Systems-Built/Modular.

AbodeZ’s principal of design and construction, Kin Lau, faced a critical choice regarding heating and hot water for his modules: build self-contained systems for each unit, or create a centralized system that could serve them all. “If a unit’s heat or hot water fails, it’s a critical failure,” Lau says. “With a centralized plant, we could put boilers in a series; if one fails, there’s another to back it up immediately. By going centralized, we’re delivering better comfort and value for the building.”

Lau’s design incorporates three Vitodens 200 condensing boilers to provide heat and hot water, which is included in the rent. High-velocity air handlers in each unit give residents control over their comfort.

The boiler room, like the residential units, was built as a module as well. Viessmann technology made it simple. Bill Mower of Avila Plumbing & Heating supervised the construction. “Viessmann’s rack system saved a ton of labor,” he explains. “Your header, your primary loop—it’s all set up.” Mower’s team assembled the system in the shop in just three days. “We built it on a flat steel plate with castors,” he says. “When we were ready, we trucked it to the site and just rolled it into the boiler room.” On site hook-up with venting took just another two weeks to complete.

Bob Avila, president of Avila Plumbing & Heating, notes, “In our business, we put in a million different boilers. These [at 603 Concord] were easy to program, and everyone at Viessmann was very helpful. Everything went well with no hiccups.”

“At AbodeZ,” concludes Lau, “we develop projects that are good for the environment and comfortable to residents. Viessmann was able to contribute a quality product and make it competitive.”

Related References

Trout Lake Community Centre & Ice Rink
Commercial
Gas

Trout Lake Community Centre and Ice Rink – Vancouver, BC

Vancouver's Trout Lake Community Centre is a LEED certified, state-of-the-art multi-use sports and recreational facility. The Centre's gas-fired condensing boiler system consists of a total of seven Vitodens 200 boilers.

Read more
Social Housing Project – Toronto, ON
Apartments
Gas

Social Housing Project – Toronto, ON

Three Vitocrossal 300, CA3 commercial condensing boilers, each rated at 4000 MBH, replaced two outdated and oversized boilers to provide reliable, efficient heat to three high-rise apartment buildings.

Read more
Table Rock Welcome Centre – Niagara Falls, ON
Commercial
Gas

Table Rock Welcome Centre – Niagara Falls, ON

The Table Rock Welcome Centre, situated next to the world's most recognizable waterfall, hosts more that 8 million visitors per year. Viessmann heating technology in the form of three Vitocrossal 300, CT3 gas-fired condensing boilers, rated at 2702 MBH each, provides space heating for the Centre's new viewing gallery, as well as exterior ice and snow melt.

Read more
Evergreen Brick Works – Toronto, ON
Commercial
Gas
Solar

Evergreen Brick Works – Toronto, ON

The Evergreen Brick Works is a multi-use facility comprising various structures, including the LEED Platinum certified Centre for Green Cities (CGC). The five-storey CGC's space heating and domestic hot water needs are satisfied by a Vitocrossal 300, CT3 condensing boiler, augmented by two Vitorond 200, VD2 boilers and six Vitosol 200-F flat plate solar thermal collector panels.

Read more
YMCA - Sturgeon Bay, WI
Commercial
Gas

YMCA - Sturgeon Bay, WI

A commercial boiler and hot water system replacement for the Sturgeon Bay YMCA pool led to increased efficiency and reliability.

Read more
Vitocrossal 300 CA3 gas condensing boiler
Commercial
Gas

The Jordan Hotel - Sunday River, Maine

Viessmann’s largest condensing boiler helps resort reach new levels of fuel efficiency.

Read more
How can we help?
How can we help?